US Bank - Clovis Renovation

The US Bank project consisted of an 1200 square foot CMU Brick Veneer addition to the existing 2501 N Prince branch, located in Clovis, NM. The entire utilities were relocated, and updated power, communications and data were installed. The project included  installation of an TPO Membrane roof over both the new as well as a complete new roof upgrade over the existing building which is approximately 2800 square feet. New HVAC for both new and existing was installed to meet new guidelines for energy conservation and environmental standards. ADA upgrades to existing restrooms. A new storefront entry vestibule with ADA accessibility from a newly designed and enlarged east parking lot. The entire site parking was up graded to six inch concrete, for an increased durability and sustainability for a highly differing  temperatures climate, as well as a more user friendly traffic control pattern. The site improvements included a completely new landscape, meeting low water and xeriscape design to enhance the aesthetic appeal as well as  cost saving water controls.

Previous
Previous

Clovis Community College PTA Program Remodel

Next
Next

Village of Des Moines - Fire Station, Phase II